|
New Home Construction
San Juan Island, during construction, 2005-06 The foundation hammered into solid rock. A site built timberframe hybrid, with stick framed walls and roof system on the timberframe. Engineered timber beams. Radiant floor heat with FSC Certified engineered hardwood flooring. Rain screen siding systems and natural material finishes selected to blend into the local environment. 3 Star Built Green rating. Back to the Portfolio |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|